Back to Master Portfolio
Exclusive Off-Market Opportunity: NCND Required

PK25 Hospitality Eco-Resort and Hotel Site: 1.03 Hectares (Lagoon Kite Beach)

Shell-stage concrete structures (Gros Œuvre) for 28 guest rooms, 2 bungalows, 1 private villa, restaurant, and 2 swimming pools at Kite Beach PK25.

2.400.000 € (≈ 26.400.000 MAD)
● Freehold Titre Foncier (10,300 m²)
WhatsApp Othman Directly ↗
PK25 Semi-Constructed Hospitality Eco-Resort Onsite Real Photo
Figure 2: PK25 Lagoon Resort on-site inspection. Completed reinforced concrete shell (Gros Œuvre) for 28 guest rooms and dual pool basins, bypassing 18 to 24 months of ground-up permitting and structural works.
Kite Beach PK25 | 10,300 m² (1.03 Ha)

Completed Concrete Structures (Gros Œuvre): 28 Rooms, Villa and Dual Pools

This eco-resort sits at the center of Dakhla luxury sports hospitality sector. Acquiring a site with pre-approved licenses and completed structural concrete framework bypasses 18 to 24 months of zoning authorizations and excavation periods.

Freehold Titre Foncier (Unencumbered) Fully Permitted Urban Master Plan NCND Protocol
10,300 m²
Total Plot Area (1.03 Ha)
28 + 2 Units
Hotel Rooms & Bungalows
1 Private Villa
Executive / Owner Residence
2 Pools & Resto
Foundations & Shell Complete

Completed Structural Works (Gros Œuvre)

Current on-site completed concrete frameworks ready for interior fit-out and finishing:

ComponentCapacity / UnitsCurrent StatusEngineering Specification
Hotel Guest Building
28 RoomsShell CompleteMulti-level reinforced concrete framework with ocean-facing balcony terraces
Standalone Bungalows
2 BungalowsShell CompletePrivate detached suites designed for premium VIP guest accommodations
Executive Villa
1 VillaShell CompleteSpacious private residence for owners or presidential lodge buyout
Restaurant & Bar Area
Dining & LoungeFramework PouredPanoramic dining hall, commercial kitchen footprint, and sunset cocktail terrace
Swimming Pools
2 PoolsFoundations PouredDual swimming pool concrete structural basins with plumbing conduit routes

Verified On-Site Construction Records (June 2024 Inspection)

On-site photographic records confirming completed shell structures, stone perimeter boundary, multi-tier pool excavations, and structural hotel elevation:

PK25 Hotel Main Entrance and Pool Foundations Concrete Inspection
Main Lobby and Dual Pool Basins (Shell Stage)
PK25 Hotel Side Elevation and Stone Wall Facade Inspection
Side Elevation and Desert Stone Boundary Wall

Time-to-Market Advantage: Bypassing 24 to 36 Months of Greenfield Permitting

Greenfield hotel developments in Dakhla typically require 24 to 36 months for environmental approvals, architectural permits, and deep excavation. This semi-constructed asset bypasses that timeline entirely.

The purchaser can immediately mobilize interior contractors, MEP specialists, and finishing crews to bring the hotel to market ahead of the 2028 World Cup and Port expansion wave.

Third-Party Structural Engineering Audit and Transferable Building Licenses

Third-party certified structural engineering audit
Active, transferable building licenses in good standing
Titre Foncier unencumbered freehold ownership
Available strictly upon execution of an NCND
Exclusive Off-Market Opportunity: NCND Required

Request PK25 Eco-Resort Technical Dossier and NCND Acquisition Agreement

Receive certified structural engineering inspection reports, architectural blueprints, active building permits, and turnkey acquisition pricing.

WhatsApp Othman Directly ↗
Prev: 8.4 Ha Master LotissementNext: PK27 Frontline Plot