Back to Master Portfolio
Exclusive Off-Market Opportunity • NCND Required

1.03 Hectare Hospitality Site & Eco-Resort

Shell-stage concrete structures (Gros Œuvre) for 28 guest rooms, 2 bungalows, 1 private villa, restaurant, and 2 swimming pools at Kite Beach PK25.

PK25 Hospitality Eco-Resort 3D Architectural Model
Kite Beach PK25, Dakhla • 10,300 m² (1.03 Ha)

Fast-Track Hospitality Execution

This unfinished eco-resort is positioned in the epicenter of Dakhla's luxury sports hospitality sector. By acquiring a site with pre-approved licenses and completed structural concrete framework, a developer bypasses 18–24 months of zoning authorizations and excavation periods, targeting immediate operational cashflow.

Titre Foncier (Clean) Building Permits Transferable Certified Structural Audit
10,300 m²
Total Plot Area (1.03 Ha)
28 + 2 Units
Hotel Rooms & Bungalows
1 Private Villa
Executive / Owner Residence
2 Pools & Resto
Foundations & Shell Complete

Completed Structural Works (Gros Œuvre)

Current on-site completed concrete frameworks ready for interior fit-out & finishing:

ComponentCapacity / UnitsCurrent StatusEngineering Specification
Hotel Guest Building
28 RoomsShell CompleteMulti-level reinforced concrete framework with ocean-facing balcony terraces
Standalone Bungalows
2 BungalowsShell CompletePrivate detached suites designed for premium VIP guest accommodations
Executive Villa
1 VillaShell CompleteSpacious private residence for owners or presidential lodge buyout
Restaurant & Bar Area
Dining & LoungeFramework PouredPanoramic dining hall, commercial kitchen footprint, and sunset cocktail terrace
Swimming Pools
2 PoolsFoundations PouredDual swimming pool concrete structural basins with plumbing conduit routes

Verified On-Site Construction Records (June 2024 Inspection)

Actual on-site photographic evidence confirming completed shell structures (Gros Œuvre), stone perimeter boundary, multi-tier pool excavations, and structural hotel elevation:

PK25 Hotel Main Entrance & Pool Foundations Concrete Inspection
Main Lobby & Dual Pool Basins (Shell Stage)
PK25 Hotel Side Elevation & Stone Wall Facade Inspection
Side Elevation & Desert Stone Boundary Wall

Time-to-Market Acceleration

Greenfield hotel developments in Dakhla typically require 24–36 months for environmental approvals, architectural permits, and deep excavation. This semi-constructed asset bypasses that timeline completely.

The purchaser can immediately mobilize interior contractors, MEP specialists, and finishing crews to bring the hotel to market ahead of the 2028 World Cup & Port expansion wave.

Off-Market Transaction Protocol

Third-party certified structural engineering audit
Active, transferable building licenses in good standing
Titre Foncier unencumbered freehold ownership
Available strictly upon execution of an NCND
CONFIDENTIAL HOSPITALITY DOSSIER & NCND

Request PK25 Eco-Resort Dossier & NCND

Receive certified structural engineering inspection reports, architectural blueprints, active building permits, and turnkey acquisition pricing.

Prev: 8.4 Ha Master LotissementNext: Lagoon Kitesurf Parcel